About kcoudbut

This author has not yet filled in any details.
So far kcoudbut has created 17 blog entries.

Rockdoor Installation

By |2020-01-06T10:22:58+00:00December 27th, 2019|Domestic|

Rockdoor Installation Ultra Developments were instructed to re-surface disused ground at Warrington Bank Quay station car park by our rail partners Lorne Stewart. Concrete bollards had to be removed, new kerbs were installed and a new drop down bollard installed. Full excavation and levelling, 150 dense base, Binder course, and stone mastic Asphalt

Warrington Bank Quay

By |2020-01-06T10:00:15+00:00December 27th, 2019|Railway|

Warrington Bank Quay Our sister company, Ultra Developments, were instructed to re-surface disused ground at Warrington Bank Quay station car park by our rail partners Lorne Stewart. Concrete bollards had to be removed, new kerbs were installed and a new drop down bollard installed. Full excavation and levelling, 150 dense base, Binder course, and stone

Virgin Trains at Crewe

By |2020-01-06T09:33:16+00:00December 27th, 2019|Railway, Uncategorized|

Virgin Trains at Crewe Our sister company, Ultra Developments, were tasked with the replacement of a rotten timber canopy at Virgin trains training centre in Crewe. Ultra replaced all rotten timber and ply wood with new and installed new gutters and downpipes to stop the same issues occurring again. All Lead lined internal

Bowyers Close

By |2019-11-06T17:54:29+00:00November 6th, 2019|Domestic|

Commercial Glazing at Liverpool One Our sister company, Ultra Developments completed this project as a preferred partner for HMS (Housing Maintenance Solutions). Ultra Developments converted a standard garage, to become a bedroom and disabled wet room facility. The specialist conversion included knocking through from original property to the garage, configuring the layout to enable a

Hunts Cross Station

By |2019-11-06T17:51:08+00:00November 6th, 2019|Railway|

Hunts Cross Station Our sister company, Ultra Developments, attended Hunts Cross railway station to repair malicious damage after a call from Mitie Rail Division. Within seven working days Ultra Developments installed a new Aluminium frame and cill flashing, glazed with laminated safety glass. Ultra Developments also repaired damaged brickwork to give Mitie Rail

Monks Way

By |2019-11-06T17:46:33+00:00November 6th, 2019|Domestic|

Monks Way Our sister company, Ultra Developments, converted this drive under car port, to become part of the internal hall space. New vertical radiator, Led spotlights, new plastered walls and ceilings with coving matching the rest of the hallway. New front Rockdoor and side panels. Externally we installed a new tiled roof, and fitted new

Commercial Glazing at Liverpool One

By |2019-10-01T13:21:06+00:00October 1st, 2019|Uncategorized|

Commercial Glazing at Liverpool One CWBS have worked with Liverpool One shopping and leisure complex on a variety of commercial projects. From the installation of planned and emergency glazing and repairs, to complete shop rip outs. Ultra Developments undertake the replacement of damaged panels, shop front glazing and general repairs. Ultra Developments work very closely

Summer Upgrades

By |2019-07-31T09:57:57+00:00July 31st, 2019|Domestic|

Summer Upgrades CWBS have the skills and workforce to complete any glazing commercial or domestic needs. Here are a few of our summer upgrades, summer houses to conservatories. For more information or a quote please contact us. One of our expert team will we be on hand to offer advice any guidance when planing your

Sash Window Installation

By |2019-06-25T08:08:48+00:00June 25th, 2019|Domestic|

Sash Window Installation CWBS installed new windows to the front of this property. Existing windows were replaced with white UPVC sliding sashes with sash horns. Planning permission was required for this installation, all applications and liaison with the planning office was dealt with by CWBS, taking the hassle away from the customer, with this tricky

Go to Top