Warrington Bank Quay

By |2020-01-06T10:00:15+00:00December 27th, 2019|Railway|

Warrington Bank Quay Our sister company, Ultra Developments, were instructed to re-surface disused ground at Warrington Bank Quay station car park by our rail partners Lorne Stewart. Concrete bollards had to be removed, new kerbs were installed and a new drop down bollard installed. Full excavation and levelling, 150 dense base, Binder course, and stone

Virgin Trains at Crewe

By |2020-01-06T09:33:16+00:00December 27th, 2019|Railway, Uncategorized|

Virgin Trains at Crewe Our sister company, Ultra Developments, were tasked with the replacement of a rotten timber canopy at Virgin trains training centre in Crewe. Ultra replaced all rotten timber and ply wood with new and installed new gutters and downpipes to stop the same issues occurring again. All Lead lined internal

Hunts Cross Station

By |2019-11-06T17:51:08+00:00November 6th, 2019|Railway|

Hunts Cross Station Our sister company, Ultra Developments, attended Hunts Cross railway station to repair malicious damage after a call from Mitie Rail Division. Within seven working days Ultra Developments installed a new Aluminium frame and cill flashing, glazed with laminated safety glass. Ultra Developments also repaired damaged brickwork to give Mitie Rail

Lime Street Station

By |2019-06-25T08:01:52+00:00June 25th, 2019|Railway|

Lime Street Station: Old disused signal box Our sister company, Ultra Developments, completed minor refurbishment on old disused signal box. Works undertaken: Removal of all damaged glazing on steel windows, all windows then rubbed down and wired brushed ready for painting. Epigrip primer and intermediate paint applied before Resistex special finish top coat was applied.

Liverpool South Parkway

By |2019-04-18T13:30:48+00:00April 18th, 2019|Railway|

Liverpool South Parkway Station Reactive railway work carried out by our sister company Ultra Developments. Ultra installed three number 32mm Schuco system glazed units to the rear façade of the station. Ultra were called on emergency response to board the broken panels up when damage occurred. We made this station safe within four hours of

Go to Top